Editorial by Andrew Gregson

I’ve heard the word “done” a lot in the last few days in reference to the Murray-Darling Basin Plan, albeit in a range of contexts. I’ve heard “we’ve been done”, I’ve heard “the Greenies got done” but perhaps most troubling of all I’ve heard “it’s done”. The good news is that we’ve ended up with a Plan drastically better than it might have been, thanks in no small parts to the efforts of community and irrigation leaders who give their time to NSWIC. As the article inside attests, the Plan is a long way from perfect, but a long way from what it might have been. By no means, though, is it “done”. The implementation period lies ahead, and it is in that period that danger lies. During the last four years, we invested a whole lot of resource into ensuring the Plan was a discussion point around the dinner tables of Sydney, Melbourne, Adelaide and Brisbane. We took a rural issue and made it important in urban electorates. That, to a large extent, assisted in softening the impact of the thing. The danger now lies in those  same dinner tables thinking it is “done” whilst we get “done” in the implementations. We need to be on top of – and involved in – Environmental Watering Plans, Water Recovery Strategies, Environmental Works and Measures
programs and countless funding and charging decisions. Each and every one of those has the capacity to turn the Plan on its head and leave us with the sort of outcomes that we don’t want. Now is the time for detail, the time to be vigilant and the time to be well informed. We need to hear from you and you need to hear from us. Thanks for staying in touch. 
M
ake no mistake – water is scarce and there are many competing demands. Ensuring sufficient Productive Water is and will continue to be an ongoing and difficult task. It’s far from done…

Read the full Productive Water Journal from Summer 2013 [HERE]